King Plastic – 800 kW Rooftop Solar Turnkey ProjectModern Electrical Pvt. Ltd.

King Plastic – 800 kW Rooftop Solar Turnkey ProjectModern Electrical Pvt. Ltd.

King Plastic – 800 kW Rooftop Solar Turnkey ProjectModern Electrical Pvt. Ltd. successfully executed an 800 kW rooftop solar project for King Plastic. The full turnkey solution included:Design, supply, and installation of the solar system.Comprehensive underground cabling work.11 kV HT line erection for seamless energy transmission.This project demonstrates our commitment to providing end-to-end solutions in Solar EPC and electrical infrastructure.

Features of Project

Prepare Documentation
Brand Consistency
Quality Control System
Prepare Documentation
Brand Consistency
Quality Control System

Working Process

01
Step

Design and Planning

The project involved detailed designing and planning by Modern Electricals Pvt. Ltd., ensuring optimal layout and integration of solar panels to maximize energy generation and efficiency.
02
Step

Component Sourcing

High-quality solar panels, inverters, and other critical components were sourced to guarantee the long-term reliability and performance of the system.
03
Step

Testing and Quality

Rigorous testing and quality checks were conducted at every stage to ensure the installation met industry standards and delivered consistent energy output.
04
Step

Final Assembly

The final assembly was carried out with precision, ensuring seamless integration of all components, resulting in a robust and efficient solar power system tailored to King Plastic's energy needs.

Project Information

Completely synergize resource taxing relationships via premier.

Client Name

King Plastic

Category

Modernel

Have a
project in
mind?